$1,642,784 is available from Proposition 1B allocated to Glenn County. Listed below are the projects approved by the Glenn County Board of Supervisors at their regular meeting on Septmber 25, 2007. A map of the project sites is currently under construction and will be available at a later date. Updates as to the progress of each project will be posted on this link.
| ADT |
Project # |
Road Project |
Project Type |
Cost Estimate |
Notes |
| 275 |
1B0757P |
Road 57 from M to P |
Full depth reclamation, double chip seal |
$ 351,267 |
Base & paving failure |
| 300 |
1B07P48 |
Road P from Hwy 162 to 48 |
Full depth reclamation, double chip seal |
$ 160,000 |
Base & paving failure |
| 215 |
1B0768CO |
Road 68 from Colusa Co west 1.5 mi |
Full depth reclamation, double chip seal |
$ 260,000 |
Base & paving failure |
| 235 |
1B0757D |
Road 57 from D to M |
Double chip seal with fog seal |
$ 120,000 |
Truck route, paving failures |
| 460 |
1B0729V |
Road 29 from Hwy 45 to V |
Double chip seal with fog seal |
$ 105,000 |
Truck route, paving failures |
| 3,720 |
1B0799W |
Hwy 99W from 48 to 16 |
Cape Seal (chip seal, slurry seal) |
$ 646,517 |
Pavement preservation |
| 650 |
1B07S21 |
Road S from 21 to 24 |
Double chip seal over paving fabric |
$ - |
Paving failures - cracking |
| 715 |
1B0724S |
Road 24 from S west 1.1 mi. |
Double chip seal over paving fabric |
$ - |
Paving failures - cracking |
| 1,035 |
1B07P20 |
Road P from Hwy 32 to 20 |
Double chip seal over paving fabric |
$ - |
Paving failures - cracking |
| 690 |
1B07200P |
Road 200 from N to P |
Double chip seal over paving fabric |
$ - |
Paving failures - cracking |
| |
|
|
Total Prop 1B Projects: |
$ 1,642,784 |
|
| |
|
|
|
|
|
| |
|
|
Propostion 1B Maintenance Categories |
|
|
| |
|
|
|
|
|
| |
|
|
Resurfacing, reconstruction |
|
|
| 275 |
1B0757P |
Road 57 from M to P |
Full depth reclamation, double chip seal |
$ 351,267 |
|
| 300 |
1B07P48 |
Road P from Hwy 162 to 48 |
Full depth reclamation, double chip seal |
$ 160,000 |
|
| 215 |
1B0768CO |
Road 68 from Colusa Co west 1.5 mi |
Full depth reclamation, double chip seal |
$ 260,000 |
|
|
|
|
|
$ 771,267 |
|
|
|
|
Slurry seals |
|
|
| 235 |
1B0757D |
Road 57 from D to M |
Double chip seal with fog seal |
$ 120,000 |
|
| 460 |
1B0729V |
Road 29 from Hwy 45 to V |
Double chip seal with fog seal |
$ 105,000 |
|
| 3,720 |
1B0799W |
Hwy 99W from 48 to 16 |
Cape Seal (chip seal, slurry seal) |
$ 646,517 |
|
|
|
|
|
$ 871,517 |
|
| Notes: ADT is average daily traffic counts in a 24 hour period |
|
|
|
|
|
|
|
|
|
|
|
Pages
Resource Library
Freq. Asked Questions
Calendar Events
Minutes & Agendas
Links
Contact Us
Member Login
Home Page
Prop 1B Projects
Road Conditions
Opinion Poll
Help us improve our web site by taking a quick survey
|