RFP EXTENSION: UPDATE TO (MULTI-JURISDICTION) HAZARD MITIGATION PLAN
Attachment | Size |
---|---|
RFP EXTENSION: UPDATE TO (MULTI-JURISDICTION) HAZARD MITIGATION PLAN (382.33 KB) | 382.33 KB |
RFP: UPDATE TO (MULTI-JURISDICTION) HAZARD MITIGATION PLAN
Attachment | Size |
---|---|
RFP for Glenn County LHMP Update.pdf (293.82 KB) | 293.82 KB |
Colusa Subbasin Project & Management Actions (2022)
The purpose of this form is to gather ideas for potential projects and management actions (PMAs) that could be evaluated and possibly be included in the Colusa Subbasin GSP. The initial Colusa Subbasin GSP was submitted in January 2022 and contains PMAs that were submitted during the GSP development process. Now that the GSP has been submitted and we are looking toward implementation, the GSAs have re-opened the PMA Submittal Form to collect additional suggestions and ideas to help the Colusa Subbasin reach and maintain sustainability. It is important to recognize the GSP is a living document and must be adaptive.
Potential PMAs may fall under several categories, including but not limited to the following:
- Recharge projects
- Supply augmentation projects
- Water conservation projects
- Projects to reduce non-beneficial consumptive use
- Groundwater pumping allocations
- Monitoring programs (groundwater pumping, water levels, stream flows, etc.)
An online version of this form can be accessed at https://arcg.is/eWTbn or use the QR code below. This is the preferred submittal method.
Please share YOUR ideas by completing and submitting a PMA Submittal Form. Submittals are due September 8, 2022 at 11:59 pm. To submit:
- Online submittal or use QR code above: Electronic submittal (preferred method)
- Microsoft Word version: Email or print and mail
- PDF version: Email or print and mail
Email to: | LHunter@countyofglenn.net |
Mail to: |
Glenn Groundwater Authority ATTN: Lisa Hunter 225 N. Tehama St. Willows, CA 95988 |
Attachment | Size |
---|---|
Colusa Subbasin PMA Form (8/2022)- Microsoft Word Version (41.49 KB) | 41.49 KB |
Colusa Subbasin PMA Form (8/2022)- PDF version (131.76 KB) | 131.76 KB |
Glenn Groundwater Authority Technical Advisory Commitee Meeting- February 12, 2021
Attachment | Size |
---|---|
CGA/GGA Joint TAC Meeting Cancellation- February 12, 2021 (159.88 KB) | 159.88 KB |
Colusa Subbasin Projects & Management Actions (2020)
Colusa Subbasin GSP Projects and Management Actions (PMAs) Submittal Form
The purpose of this form is to gather ideas for potential projects and management actions (PMAs) that could be evaluated and ultimately included in the Colusa Subbasin GSP. Once ideas are gathered, an initial screening and evaluation process will be conducted, followed by ranking of potential PMAs for more detailed evaluation and inclusion in the initial GSP. Potential PMAs may fall under several categories, including but not limited to the following:
• Recharge projects
• Supply augmentation projects
• Water conservation projects
• Projects to reduce non-beneficial consumptive use
• Groundwater pumping allocations
• Monitoring programs (groundwater pumping, water levels, stream flows, etc.)
Please share YOUR ideas by completing and submitting a PMA Submittal Form. Submittals are due May 3, 2021 at 5:00 pm. To submit:
- Google form: Electronic submittal (you do have to log in to your google account to access this option)
- Microsoft Word version: Email or print and mail
- PDF version: Email or print and mail
Email to: | LHunter@countyofglenn.net |
Mail to: |
Glenn Groundwater Authority ATTN: Lisa Hunter 225 N. Tehama St. Willows, CA 95988 |
Attachment | Size |
---|---|
Colusa Subbasin PMA Form (12/2020)- Microsoft Word version (90.34 KB) | 90.34 KB |
Colusa Subbasin PMA Form (12/2020)- PDF version (122.49 KB) | 122.49 KB |
RFP County General Plan & Zoning Code Update
Attachment | Size |
---|---|
RFP County General Plan & Zoning Code Update (619.54 KB) | 619.54 KB |
Potential Site Layouts for Phase I - Schematic Layout - Parcels 3 & 9
Attachment | Size |
---|---|
Potential Site Layouts for Phase I - Schematic Layout - Parcels 3 & 9 (656.52 KB) | 656.52 KB |
Potential Site Layouts for Phase I - Schematic Layout - Parcels 1
Attachment | Size |
---|---|
Potential Site Layouts for Phase I - Schematic Layout - Parcels 1 (692.02 KB) | 692.02 KB |
Potential Site Layouts for Phase I - Schematic Layout - Parcels 1, 3, & 9
Attachment | Size |
---|---|
Potential Site Layouts for Phase I - Schematic Layout - Parcels 1, 3, & 9 (837.82 KB) | 837.82 KB |
Willows Airport Master Plan Adopted August 19, 2008
Attachment | Size |
---|---|
WAMP - Title Page (42.83 KB) | 42.83 KB |
WAMP - Table of Contents (89.87 KB) | 89.87 KB |
WAMP - Background & Inventory (6.79 MB) | 6.79 MB |
WAMP - Airport Role & Activity Forecasts (152.22 KB) | 152.22 KB |
WAMP - Airfield Design (1.28 MB) | 1.28 MB |
WAMP - Building Area Development (236.6 KB) | 236.6 KB |
WAMP - Finance & Implementation (947.81 KB) | 947.81 KB |
WAMP - Reference Documents (51.25 KB) | 51.25 KB |
WAMP - Noise Model Calculation Data (70.63 KB) | 70.63 KB |
WAMP - Glossary of Terms (144.1 KB) | 144.1 KB |
WAMP - Airport Layout - 1 of 6 (Updated Oct. 2010) (1.59 MB) | 1.59 MB |
WAMP - Building Area Layout - 2 of 6 (Updated Oct. 2010) (747.44 KB) | 747.44 KB |
WAMP - Data Layout - 3 of 6 (Updated Oct. 2010) (841.95 KB) | 841.95 KB |
WAMP - Airspace Layout - 4 of 6 (Updated Oct. 2010) (759.34 KB) | 759.34 KB |
WAMP - Airspace Layout - 5 of 6 (Updated Oct. 2010) (451.33 KB) | 451.33 KB |
WAMP - Property Map Layout - 6 of 6 (Updated Oct. 2010) (815.81 KB) | 815.81 KB |
Orland Airport Master Plan Adopted April 3, 1990
Attachment | Size |
---|---|
OAMP - Title Page and Table of Contents (1.49 MB) | 1.49 MB |
OAMP - Introduction (323.9 KB) | 323.9 KB |
OAMP - Conclusions and Recommendations (2.93 MB) | 2.93 MB |
OAMP - Airport Plans (2.27 MB) | 2.27 MB |
OAMP - Background and Inventory (4.32 MB) | 4.32 MB |
OAMP - Airport Activity (2.85 MB) | 2.85 MB |
OAMP - Airfield Design (5.04 MB) | 5.04 MB |
OAMP - Building Area Development (3.65 MB) | 3.65 MB |
OAMP - Land Use and Environmental Issues (4.05 MB) | 4.05 MB |
OAMP - Appendices (8.35 MB) | 8.35 MB |
Glenn County Airport Land Use Plans
Attachment | Size |
---|---|
Orland Airport Land Use Plan - 1991 (7.06 MB) | 7.06 MB |
Willows Airport Land Use Plan - 1990 (7.14 MB) | 7.14 MB |
Airport Land Use Commission - March 29, 2010
Attachment | Size |
---|---|
ALUC Agenda - March 20, 2010 (56.21 KB) | 56.21 KB |
ALUC Minutes - March 20, 2010 (192.66 KB) | 192.66 KB |