Report – New Agricultural Water Well Restriction, Glenn County Urgency Ordinance #1301
Attachment | Size |
---|---|
Report – New Agricultural Water Well Restriction, Glenn County Urgency Ordinance #1301 (130.08 KB) | 130.08 KB |
Colusa Subbasin Groundwater Sustainability Plan Draft Chapters 5-6
On behalf of the Colusa Groundwater Authority (CGA) and Glenn Groundwater Authority (GGA), we are pleased to offer an opportunity to review initial content for several chapters of the pending Groundwater Sustainability Plan (GSP) for the Colusa Subbasin. The chapters can be found at the following link:
https://westyost-my.sharepoint.com/:f:/p/areimer/EjoqpnAYW8NEpL30LqxpMGgBCAvxIhfoxndh2iOGwuLxhw
The GSP is being prepared as a requirement of the Sustainable Groundwater Management Act of 2014 (amended 2015). Available at the link above for your review are the following initial GSP chapters in “pdf” format:
- Chapter 5 – Sustainable Management Criteria
- Chapter 6 – Projects and Management Actions
- Appendices 5A-5C
- Appendices 6A-6D
Please note that this review period is not a formal review for the entire GSP. That will come in approximately September. This initial review period ends at midnight on August 13, 2021 so please respond in a timely manner.
Your input is very important to us. To ensure we have an accurate and consistent account of all comments, we have prepared a standardized comment submission approach.
Attached with this message is an MS Word document and a pdf file, both titled “Colusa Subbasin GSP Chapter Input”. The files introduce a table that allows you to easily enter the following key information so we have certainty about your input. The table includes the following categories:
- Chapter Number
- Section Number
- Page Number
- Paragraph Number (starting with the first full paragraph at the top of a given page)
- Figure/Table Number (if applicable)
- Comment
Please use the following instructions so we capture all your important feedback.
INSTRUCTIONS
- Please ONLY use the MS Word or PDF document titled “Colusa Subbasin GSP Chapter Input” to submit your comments.
- Review all applicable text and note each Chapter, Section, Page, and Paragraph number associated with a comment you’d like to make. For Paragraph number, please start with the first full paragraph at the top of a given page and count down.
- Enter your name and if applicable, an organizational affiliation at the top of your table.
- Once you have completed all your comments, please save the file with your last name at the end in parentheses. For example:
-
- Colusa Subbasin GSP Chapter Input (Jones).docx
-
If you are located in the GGA, please send your comment file to:
- Lisa Hunter – Program Coordinator - Glenn Groundwater Authority: lhunter@countyofglenn.net
-
If you are located in the CGA, please send your comment file to
- Mary Fahey – Program Coordinator - Colusa Groundwater Authority: mfahey@countyofcolusa.com
- If you don’t affiliate specifically with either the CGA and/or GGA, please send your comments to both Mary and Lisa.
- Please make sure that your comments are submitted by midnight August 13, 2021.
In closing, thank you in advance for dedicating your time to review these materials. Your input is very important to us and we look forward to getting your perspectives on this GSP. Please contact me with any questions and comments.
Colusa Subbasin GSP Chapter 5. Sustainable Management Criteria- DRAFT 7/16/21
Colusa Subbasin GSP Chapter 6. Projects and Management Actions- DRAFT 7/16/21
Colusa Subbasin GSP Appendix 5A. Process and Rationale for Setting Minimum Thresholds and Measurable Objectives for Groundwater Levels and Depletions of Interconnected Surface Waters- DRAFT 7/16/21
Colusa Subbasin GSP Appendix 5B. Economic Analysis of Groundwater Level Minimum Thresholds- DRAFT 7/16/21
Colusa Subbasin GSP Appendix 5C. Electrical Conductivity Historical Trends, Minimum Thresholds and Measurable Objectives- DRAFT 7/16/21
Colusa Subbasin GSP Appendix 6A. Surface Water Available for Recharge and Financial Incentives in the Colusa Subbasin- DRAFT 7/16/21
Colusa Subbasin GSP Appendix 6B. Economic Analysis of Demand Management and Conceptual Allocation Approaches- DRAFT 7/16/21
Colusa Subbasin GSP Appendix 6C. Overview of Projects and Management Actions- DRAFT 7/16/21
Colusa Subbasin GSP Appendix 6D. Development of Modeling Parameters for Simulating Projects and Management Actions in the Colusa Subbasin- DRAFT 7/16/21
Colusa Subbasin GSP Chapter Input- Microsoft Word version 7/16/21
Colusa Subbasin GSP Chapter Input- PDF version 7/16/21
Public Meetings: Colusa Subbasin SGMA-Series (July 2021)
Attachment | Size |
---|---|
Colusa Subbasin SGMA-Series Meeting Agenda (July 2021) (131.97 KB) | 131.97 KB |
Colusa Subbasin SGMA-Series Meeting Presentation (July 2021) (478.48 KB) | 478.48 KB |
Colusa Subbasin SGMA-Series Flyer (July 2021) (149.75 KB) | 149.75 KB |
Colusa Subbasin SGMA-Series Flyer (Spanish) (July 2021) (146.75 KB) | 146.75 KB |
Press Release: Public Meetings Groundwater Sustainability Plan Draft Chapters (July 2021) (111 KB) | 111 KB |
Flood-MAR Multi-Benefit Recharge Pilot Program
Attachment | Size |
---|---|
Flood-MAR Multi-Benefit Recharge Pilot Program Workshop- July 15, 2021 (161.23 KB) | 161.23 KB |
Corning Sub-basin Groundwater Sustainability Agency Committee- July 14, 2021
Attachment | Size |
---|---|
CSGSA Committee Agenda- July 14, 2021 (182.97 KB) | 182.97 KB |
CSGSA Committee Zoom Guidance- July 14, 2021 (303.54 KB) | 303.54 KB |
CSGSA Committee Meeting Packet- July 14, 2021 (13.09 MB) | 13.09 MB |
Glenn Groundwater Authority Meeting- July 12, 2021
Attachment | Size |
---|---|
GGA Agenda- July 12, 2021 (244.84 KB) | 244.84 KB |
GGA Meeting Packet- July 12, 2021 (8.25 MB) | 8.25 MB |
GGA Meeting Materials: Tuscan Water District application- July 12, 2021 (10.35 MB) | 10.35 MB |
GGA Program Manager Report- July 12, 2021 (356.66 KB) | 356.66 KB |
GGA Meeting Minutes- July 12, 2021 (266.88 KB) | 266.88 KB |
Glenn Groundwater Authority Technical Advisory Committee Meeting- July 9, 2021
Attachment | Size |
---|---|
CGA/GGA Joint TAC Meeting Cancellation- July 9, 2021 (246.21 KB) | 246.21 KB |
Glenn Groundwater Authority Meeting- June 16, 2021
Attachment | Size |
---|---|
GGA Agenda- June 16, 2021 (248.72 KB) | 248.72 KB |
GGA Meeting Packet- June 16, 2021 (32.16 MB) | 32.16 MB |
GGA Program Manager Report- June 16, 2021 (536.09 KB) | 536.09 KB |
GGA Meeting Minutes- June 16, 2021 (279.24 KB) | 279.24 KB |
Glenn Groundwater Authority Technical Advisory Committee Meeting- June 11, 2021
Attachment | Size |
---|---|
CGA/GGA Joint TAC Agenda- June 11, 2021 (307.02 KB) | 307.02 KB |
CGA/GGA Joint TAC Meeting Packet- June 11, 2021 (375.56 KB) | 375.56 KB |
CGA/GGA Joint TAC Draft Presentation- June 11, 2021 (2.39 MB) | 2.39 MB |
Corning Sub-basin Groundwater Sustainability Agency Committee- June 9, 2021
Attachment | Size |
---|---|
CSGSA Committee Agenda- June 9, 2021 (183.38 KB) | 183.38 KB |
CSGSA Committee Meeting Packet- June 9, 2021 (3.38 MB) | 3.38 MB |
CSGA Zoom Guidance- June 9, 2021 (303.54 KB) | 303.54 KB |
Glenn Groundwater Authority Executive Committee Meeting- May 26, 2021
Attachment | Size |
---|---|
GGA Executive Committee Meeting Cancellation- May 26, 2021 (256.2 KB) | 256.2 KB |
Glenn Groundwater Authority Technical Advisory Committee Meeting- May 19, 2021
Attachment | Size |
---|---|
CGA/GGA Joint TAC Agenda- May 19, 2021 (192.12 KB) | 192.12 KB |
CGA/GGA Joint TAC Meeting Presentation- May 19, 2021 (3.93 MB) | 3.93 MB |
Glenn Groundwater Authority Technical Advisory Committee Meeting- May 13, 2021
Attachment | Size |
---|---|
CGA/GGA Joint TAC Agenda- May 13, 2021 (192.19 KB) | 192.19 KB |
CGA/GGA Joint TAC Meeting Packet- May 13, 2021 (922.98 KB) | 922.98 KB |
CGA/GGA Joint TAC Meeting Presentation- May 13, 2021 (3.93 MB) | 3.93 MB |
Corning Sub-basin Groundwater Sustainability Agency Committee- May 12, 2021
Attachment | Size |
---|---|
CSGSA Committee Agenda- May 12, 2021 (180.91 KB) | 180.91 KB |
CSGSA Meeting Packet- May 12, 2021 (81.71 MB) | 81.71 MB |
CSGA Zoom Guidance- May 12, 2021 (303.54 KB) | 303.54 KB |
Glenn Groundwater Authority Meeting- May 10, 2021
Attachment | Size |
---|---|
GGA Agenda- May 10, 2021 (248.18 KB) | 248.18 KB |
GGA Meeting Packet- May 10, 2021 (16.03 MB) | 16.03 MB |
GGA Program Manager Report- May 10, 2021 (830.99 KB) | 830.99 KB |
GGA Meeting Minutes- May 10, 2021 (268 KB) | 268 KB |
Glenn Groundwater Authority Technical Advisory Committee Meeting- April 23, 2021
Attachment | Size |
---|---|
CGA/GGA Joint TAC Agenda- April 23, 2021 (Revised with updated meeting link) (292.58 KB) | 292.58 KB |
CGA/GGA Joint TAC Meeting Packet- April 23, 2021 (310.12 KB) | 310.12 KB |
CGA/GGA Joint TAC Meeting Presentation (DRAFT)- April 23, 2021 (3.65 MB) | 3.65 MB |
Glenn Groundwater Authority Meeting- April 22, 2021
Please note, this meeting will take place at 6:00 pm.
Attachment | Size |
---|---|
CGA/GGA Joint Board Meeting Agenda- April 22, 2021 (191.88 KB) | 191.88 KB |
CGA/GGA Joint Board Meeting Flyer- April 22, 2021 (2.37 MB) | 2.37 MB |
CGA/GGA Joint Board Meeting Presentation- April 22, 2021 (8.47 MB) | 8.47 MB |
CGA/GGA Joint Board Meeting Minutes- April 22, 2021 (211.58 KB) | 211.58 KB |
Corning Sub-basin Groundwater Sustainability Agency Committee- April 14, 2021
Attachment | Size |
---|---|
CSGSA Committee Agenda- April 14, 2021 (182.86 KB) | 182.86 KB |
CSGSA Committee Meeting Packet- April 14, 2021 (6.39 MB) | 6.39 MB |
CSGSA Committee Zoom Guidance- April 14, 2021 (303.54 KB) | 303.54 KB |
Glenn Groundwater Authority Meeting- April 12, 2021
Attachment | Size |
---|---|
GGA Agenda- April 12, 2021 (278.94 KB) | 278.94 KB |
GGA Meeting Packet- April 12, 2021 (15 MB) | 15 MB |
GGA Meeting Minutes- April 12, 2021 (257.06 KB) | 257.06 KB |
Colusa Subbasin Groundwater Sustainability Plan Draft Chapters 1-4
On behalf of the Colusa Groundwater Authority (CGA) and Glenn Groundwater Authority (GGA), we are pleased to offer an opportunity to review initial content for several chapters of the pending Groundwater Sustainability Plan (GSP) for the Colusa Subbasin. The chapters can be found by clicking on the direct links to each of the chapters below or at the following link:
The GSP is being prepared as a requirement of the Sustainable Groundwater Management Act of 2014 (amended 2015). The following initial GSP chapters are available for review in “pdf” format:
- Chapter 1 – Introduction and TOC (Table of Contents)
- Chapter 2 – Plan Area
- Chapter 3 – Basin Setting
- Chapter 4 – Monitoring Networks
- Appendix 1A through 4A
Please note that this review period is not a formal review for the entire GSP. That will come in approximately September. This initial review period ends at midnight on May 5, 2021 so please respond in a timely manner.
Your input is very important to us. To ensure we have an accurate and consistent account of all comments, we have prepared a standardized comment submission approach.
Attached with this message is an MS Word document and a pdf file, both titled “Colusa Subbasin GSP Chapter Input”. The files introduce a table that allows you to easily enter the following key information so we have certainty about your input. The table includes the following categories:
- Chapter Number
- Section Number
- Page Number
- Paragraph Number (starting with the first full paragraph at the top of a given page)
- Figure/Table Number (if applicable)
- Comment
Please use the following instructions so we capture all your important feedback.
INSTRUCTIONS
- Please ONLY use the MS Word or PDF document titled “Colusa Subbasin GSP Chapter Input” to submit your comments.
- Review all applicable text and note each Chapter, Section, Page, and Paragraph number associated with a comment you’d like to make. For Paragraph number, please start with the first full paragraph at the top of a given page and count down.
- Enter your name and if applicable, an organizational affiliation at the top of your table.
-
Once you have completed all your comments, please save the file with your last name at the end in parentheses. For example:
- Colusa Subbasin GSP Chapter Input (Jones).docx
-
If you are located in the Glenn Groundwater Authority, please send your comment file to:
- Lisa Hunter – Program Manager - Glenn Groundwater Authority: lhunter@countyofglenn.net
-
If you are located in the Colusa Groundwater Authority, please send your comment file to
- Mary Fahey – Program Manager - Colusa Groundwater Authority: mfahey@countyofcolusa.com
- If you don’t affiliate specifically with either the CGA and/or GGA, please send your comments to both Mary and Lisa.
- Please make sure that your comments are submitted by midnight May 5, 2021.
In closing, thank you in advance for dedicating your time to review these materials. Your input is very important to us and we look forward to getting your perspectives on this GSP.
Attachment | Size |
---|---|
Colusa Subbasin GSP Chapter 1 Introduction and Table of Contents- DRAFT 4/8/21 (736.6 KB) | 736.6 KB |
Colusa Subbasin GSP Chapter 2 Plan Area- DRAFT 4/8/21 (33.8 MB) | 33.8 MB |
Colusa Subbasin GSP Chapter 3 Basin Setting- DRAFT 4/8/21 (91.81 MB) | 91.81 MB |
Colusa Subbasin GSP Chapter 4 Monitoring Network- DRAFT 4/8/21 (24.08 MB) | 24.08 MB |
Colusa Subbasin GSP Appendix 1A through 4A- DRAFT 4/8/21 (59.53 MB) | 59.53 MB |
Colusa Subbasin GSP Chapter Input- Microsoft Word version 4/8/21 (160.05 KB) | 160.05 KB |
Colusa Subbasin GSP Chapter Input- PDF version 4/8/21 (135.63 KB) | 135.63 KB |